Additional work during our annual Sanctuary refurbishment

In addition to stripping and refurbishing the hardwood floors in the Sanctuary during our annual Sanctuary refurbishment, work on other parts of the hotel also went on.  Repairs and deep cleaning of individual guest rooms is taken care of during our annual week-long closure.  In addition, we tackled other projects:

The tile floor in the retail wing of the hotel was cleaned and resealed.

The tile floor in the retail wing of the hotel was cleaned and resealed.

In addition, repair work and cleaning of the indoor pool and whirlpool too place:

Sanc Refurb-indoor pool 1 Sanc Refurb-indoor pool 2 Sanc Refurb-indoor pool 3 Sanc Refurb-indoor pool 4

Currently, work on the outdoor pools is taking place, cleaning plaster, replacing broken tiles and stones and changing some water features.

The carpet in the fitness center was also replaced.  Each year, The Sanctuary team totally refurbishes the Sanctuary to insure the best possible guest experience.

Sanc Refurb-Fitness 1

Categories:
Accommodations
Tags:
,

Leave a Reply

Your email address will not be published. Required fields are marked *

* Copy This Password *

* Type Or Paste Password Here *

43,943 Spam Comments Blocked so far by Spam Free Wordpress

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>